Constrution and assembly works for the Transformer Station Budzyń 110/15 KV, 25 MW.
Constrution and power engineering works (foundation, access roads, assembly pads, cable network) for the Wind Farm Kraścino II project ( part Mołtowo). Five turbines of 1.5 MW power each.
The second stage of modernization of the electric power supply system in Świnoujście (NATO Task No. 14029)
The set of 11 wind power plants (the power of 22MW and the height of 78 each). The realization of basements of reinforced concrete about the side of the base 16 and height 2,5m.
The investor of the project is Gamesa Energía Servicios, Madrid.
Zobacz galerię
Realization of the 2 NB 15003, 15004, 15005 tasks
The modernization of the electroenergy system of the Command Of The Naval Harbour
Power engineering and telecommunication work
The Silver Screen Multiplex at The Targówek Shopping Mall - power engineering
Silver Screen multiplex cinema - power engineering, plumbing works
Zobacz galerię
Reconstruction of the segment of the overhead 110 kV line
Reconstruction of the segment of the overhead 110 kV line no. 142.
Zobacz galerię
Construction of the Main Power Supply Station (GPZ) in Gdynia Redłowo
Zobacz galerię
Preparatory work for the construction of a wind power plant Nordex 250 kW.
Investor: Sfof's Okologiske Klub, Egeltoft, Denmark
Zobacz galerię
The repair of three overhead 110 kV line supports 75m and their foundations (Gdańsk Błonia-Elbląg line), the Vistula River crossing in Kiezmark.
Zobacz galerię
The construction of the first underground line, construction of an electric traction substation, telecommunications engineering and other works.
Zobacz galerię