Transformer Station Budzyń


Constrution and assembly works for the Transformer Station Budzyń 110/15 KV, 25 MW.

 

 

 

 

 

 

 

 



Wind Farm Krościno II


Constrution and power engineering works (foundation, access roads, assembly pads, cable network) for the Wind Farm Kraścino II project ( part Mołtowo). Five turbines of 1.5 MW power each.

 

 



Electric Power Supply System in Swinoujście


The second stage of modernization of the electric power supply system in Świnoujście (NATO Task No. 14029)

 



Wind power plants

Gniezdzewo, nearby Puck

The set of 11 wind power plants (the power of 22MW and the height of 78 each). The realization of basements of reinforced concrete about the side of the base 16 and height 2,5m.

The investor of the project is Gamesa Energía Servicios, Madrid.

Zobacz galerię


The 2 NB 15005 task


Realization of the 2 NB 15003, 15004, 15005 tasks

 

 

 

 



The Naval Harbour, Gdynia


The modernization of the electroenergy system of the Command Of The Naval Harbour

 

 

 

 



The Praha Centre, Warsaw

Warsaw, Jagiellonska 26 str.

Power engineering and telecommunication work

 

 

 



The Silver Screen Cinema, Warsaw

Warszawa, ul. Głębocka

The Silver Screen Multiplex at The Targówek Shopping Mall - power engineering


 

 

 



 

Zobacz galerię


Multiplex Silver Screen, Łódź

Łódź, 5 Piłsudskiego St.

Silver Screen multiplex cinema - power engineering, plumbing works

 

 

 

 

Zobacz galerię


Reconstruction of the 110 kV line, Pomorzany

Warszawa, Pomorzany - Żytowice power line

Reconstruction of the segment of the overhead 110 kV line

 

 

 


 

Zobacz galerię


Raising of an overhead 110 kV power transmission line, Gdynia

The line between Gdynia Redłowo and Południe

Reconstruction of the segment of the overhead 110 kV line no. 142.

 

 

 

 

 

Zobacz galerię


GPZ Redłowo, Gdynia

Gdynia Redłowo

Construction of the Main Power Supply Station (GPZ) in Gdynia Redłowo

 

 

 

 

Zobacz galerię


Wind power plant, Starbienino

Starbienino

Preparatory work for the construction of a wind power plant Nordex 250 kW.

Investor: Sfof's Okologiske Klub, Egeltoft, Denmark

 

 

 

Zobacz galerię


Repair of the overhead 110 kV line supports, Kiezmark

Kiezmark

The repair of three overhead 110 kV line supports 75m and their foundations (Gdańsk Błonia-Elbląg line), the Vistula River crossing in Kiezmark.

 

 

 

 

Zobacz galerię


Construction of the Warsaw Underground

Stacja Centrum, Kabaty, Natolin, Wilanowska, Racławicka, Wierzbno, Pole Mokotowskie

The construction of the first underground line, construction of an electric traction substation, telecommunications engineering and other works.

 

 

 

Zobacz galerię


Our most important power engineering ventures completed in the 1990/2004s

  • Modernisation of overhead lines in the Dom Turysty power supply area
  • Modernisation of the LV cable line in Gdynia Obłuże
  • Repair of 15 kV line Sopot - Chwaszczyno
  • 15 kV line crossing over the Martwa Wisła River in Sobieszewo
  • Modernisation of the street lighting in Sopot
  • Major repair of a reduced voltage 15kV line with TRAFO stations for PKP in Pruszcz Gdański
  • 15kV line Gdańsk Lipce - Radunice
  • Rebuilding of transformer stations from 6kV/15kV
  • Repair of 110 kV line Gdańsk - Sopot
  • Repair of a double circuit 110 kV line GdańskI - Gdańsk II
  • Modernisation of a cable line in Sopot Górny
  • 15 kV cable line in Sierakowice
  • Main Power Supply Station in Sierakowice
  • 15 kV cable line Gdańsk-Czerwony Most exits
  • Elementary school in Gdańsk-Brzeźno - power supply and interior wiring systems
  • the Warsaw Underground - comprehensive works including power and telecommunications engineering, ventilation, air-conditioning, water supply, sewage and automation systems.
  • Main Power Supply Station in Podgrodzie
  • Main Power Supply Station in Sopot
  • Business Centre Gdynia - power supply and interior wiring systems
  • Main Power Supply Station in Redłowo
  • ETC Shopping Centre in Gdańsk - power supply and interior wiring systems
  • Street lighting in Bulońska and Dzielnicowa streets in Gdańsk
  • Major repair of 15kV cable line for PKP-1
  • Main Power Supply Station in Starogard Gdański
  • Re-insulation of 110 kV line Gdańsk- Chełm - Gdańsk - Leśniewo
  • Main Power Supply Station in Płoty 15/15/0,4kV
  • Modernisation plan for the 11 kV overhead line Bielin - Chojna
  • Aerial masts and towers: Chociwiel, Łobez, Gryfice, GPZ Swidwin, Gościno, Połczyn Zdrój, Białogard
  • Repair of 110 kV overhead line supports Gdańsk Błonia - Elbląg