Wind Farm Wysoka 1 and Wind Farm Wysoka 2


Construcion as a general contractor 3 plus19 wind turbines.

Execution of the internal approach roads, power and steering cabling, transformer station, assembly pads and wind turbines foundations for both wind farms.



Shopping Centre "ALFA PARK MORENA"


Complex execution as a General Contractor of the Community Shopping Centre " ALFA PARK MORENA " in Gdańsk.

A traditional one-storey reinforced concrete structure building, without a basement, with partly light weigh steel structure ceiling and partly concrete ceiling, corrugated steel roofing.

Floor area: 2,002.8 m2

Total area: 2,124.5 m2

Cubage: 12,747.0 m3

Outside parking places: 78

Pavements and entrances area: 1,887.5 m2 

 

 



Wind Farm Batkowo


7 wind turbines of 0,85 MW power each one.

Execution of the internal approach roads, power and steering cabling, assembly pads and wind turbines foundations.



Shopping Centre ALFA in Grudziądz


Construction as a general contractor of the

Shopping Centre Alfa in Grudziądz, 2 Chełmińska Street:

- two overground storeys of the shopping and services area;

- two overground storeys of the car park

- five cinema halls with a foyer and operator rooms;

- office area for the management of the Centre.

Gross covered area: 18,228 sq.m., total area: 50 358 sq.m., floorage: 38,102 sq.m., cubage: 233,960 cu.m.



Wind Farm Gorzkowice


6 wind turbines Gamesa G90 - 100 m of 2 MW electric power each one. Complex execution of all road works, construction works as well as electric works relating to the construction of a wind farm.



Wind Farm Pawlowo


Execution of existing ground stabilization for 4,8 km access roads to the wind towers. Removal of 5,047 m topsoil and execution of sand sub base for further stabilization of roads. Restoration of the terrain.



Overbridge WD-4


Construction of the overbridge WD-4, reinforced concrete, span about 60 m, two decks, as a part of the south Ringway (Obwodnica Południowa) of Gdańsk. 



Wind Farm - Unikowice


Construction of foundations , access roads and MV electric power cable lane !% kV for the Wind Power Plant Unikowice of 1,5 MW power.



Wind Farm-Bystra


Bystra Wind Farm near to Gdańsk - 12 Gamesa G 90 turbines , 2 MW each - construction of access roads and assembly platforms.



Northern Wharf of the Dock X


Reconstruction of the Nabrzeże Północne (nothern wharf) of the Dock X at the Maritime Base in Gdynia - piping systems at the wharf and off the wharf, electrical systems, data and low-voltage wiring systems, mechanical system , waste system, fuel system.



Wind Farm - Kobylnica


Kobylnica wind Farm- construction of turbine foundation, access roads, main substation and mean voltage cable lines with the working design. 



P.W. Agena modernization


Complex modernization and development of the P.W. Agena building in Sopot, Aleja Niepodległości 942. Constrution work, plumbing, electrical works.



Wind Farm Krzyżanów


Constrution of the Wind Farm Krzyżanów - 10 wind turbines of total power 20 MW.



Waste Treatment Plant Gdańsk Wschód


Expansion of the Waste Treatment Plant Gdańsk Wschód, stage II B-construction work for the new ITPO facilities, external services, access roads. 



Pelplin - Wind Farm


Pelplin Wind Farm -24 turbines of 2 MW each-constutcion of the Substation Pomyje with all utilities.

 

 



Hotel complex in Ostrzyce


Construction of a hotel (with Spa, swimming-pool, fitness and cardio center) complex in Ostrzyce-Somonino community. The total floorage of the complex is 2.754,3 m2.Execution of all works.