The 2nd Line of the Warsaw Metro. The western part. C06 - C09 Station

The 2nd Line of the Warsaw Metro. The western part. Execution of complete electrical systems for the C07 station, V08 tunnel ventilation shaft, D08 tunnel and D09 tunnel;  for the C08 station, the V09 tunnel ventilation shaft, the V09A dismantling shaft, the C09 station:

  • earthing and bonding system,
  • lighting and small power systems,
  • power supply and control cables for pumping stations, basic ventilation system, local ventilation system and air conditioning system, water system valves,
  • cable supporting structures,
  • time network,
  • 15 kV MV power supply cabling,
  • stray currents measuring system,
  • traction power supply network,
  • CCTV industrial television systems,
  • installations for the toll collection system,
  • the third rail switching systems (for switching on and off),
  • installation of the fourth rail on the C06 - C09 section
Termin realizacji: November 2018
Zamawiający:

GÜLERMAK AĞIR  SANAYİ İNŞAAT VE TAAHHÜT A.Ş., Ankara (Turcja)

Inwestor: Miasto Stołeczne Warszawa

 

Linia L

Construction as general contractor of five residential buildings (A1, A2, B1, B2 and B3) of the “Alfa Park 4” housing estate in Gdańsk

Construction as general contractor of five residential buildings (A1, A2, B1, B2 and B3) of the “Alfa Park 4” housing estate in Gdańsk, Myśliwska Street. Alfa Park 4 is a modern housing estate that has been integrated into the natural landscape of Staw Wróbla - a picturesque water reservoir located on the border of the Tri-City Landscape Park.

A detailed description of the investment is available on the Employer's website: https://alfapark.pl/poznaj-alfa-park-4.

 

Total number of apartments: 222
Total number of service premises: 32
Total usable surface: 15.846 m2
Total overground cubature:

67.959 m3

Total underground cubature: 25.451 m3
Completion: February 2021
Employer:

B-JWK-Management Sp. z o.o., Gdańsk

 

 

Linia L

Construction of the multi-family residential building "Yarielys Residence" in Gdynia

Construction as the general contractor of the multi-family residential building "Yarielys Residence" at 61-63 Abrahama St. in Gdynia, with commercial premises located on the ground floor, 6 storeys – 5 overground storeys and 1 underground storey (basement) with a built-in multi-station garage, with a terrace – recreation area, monolithic reinforced concrete structure, flat roof, including technical infrastructure, reconstruction of underground installations and demolition works.

 

Total number of apartments: 29
Number of service premises:

4

Total usable area: approx. 2.400 m2
Investor: Mostostal Gdynia Sp. z o.o., 00-217 Warszawa, ul. Konwiktorska 4

 

 

 

Linia L

Dormitory at 13 Sobieskiego Street in Gdańsk

Construction of a collective seven-storey residential building (dormitory for students) with underground car park, catering and fitness services, with installations and technical infrastructure in the lot located at 13 Sobieskiego Street in Gdańsk

Altogether 476 rooms will be located in the building, i.e. in this "B-1" section will include 220 rooms (199 single rooms and 21 double rooms), while in the "B-2" section there will be 256 rooms (215 single and 41 double rooms).

.

Usable area: 18 403,78 m2
Cubature: 68 527,62 m3
Commencement: June 2018
Employer:

SILVER ROCK INVESTMENT Spółka z o.o., Gdańsk

Investor: SILVER ROCK INVESTMENT Spółka z o.o., Gdańsk

 

 

Linia L

The 2nd Line of the Warsaw Metro. Execution of complete electrical installations at the C15 -C18 station

The 2nd Line of the Warsaw Metro. The western part. Execution of complete electrical systems at the C15 station, the D16 tunnel, C16 station, D17 tunnel, C17 station

  • earthing and bonding system,
  • lighting and small power systems,
  • power supply and control cables for pumping stations, basic ventilation system, local ventilation system and air conditioning system, water system valves,
  • cable supporting structures,
  • time network,
  • 15 kV MV power supply cabling,
  • stray currents measuring system,
  • traction power supply network,
  • CCTV industrial television systems,
  • installations for the toll collection system,
  • the third rail switching systems (for switching on and off),
  • installation of the fourth rail on the C15 - C18 section

 

Completion: June 2019
Employer:

Astaldi S.p.A., Rome, Italy

 

 

Linia L

 

Senior Residence

Senior Residence Residential Building with Therapeutic Centre and Nursery School in Gdańsk, Przemyska St. Construction of a complex of two buildings together with obtaining a permit to use.

The building has 89 single and double rooms with bathroom, 24 hours service facilities, nursery school, clinic and kitchen.

.

Total gross area of the building: 4 735 m2
Usable floor area of the building: 7 293 m2
Number of overground floors: 3
Number of underground storeys: 1
Completion date: the 30th of November 2018
Employer:

Millenium Inwestycje Sp. z o.o., 40-750 Katowice, ul. Hierowskiego 2

Investor: Evangelisch-Luterisches Diakoniewerk Neuendettelsau (Niemcy)
   

 

 